• SW 35th St., SW Cascade Ave. to NW Elm Ave., 10/15, one-lane shift with flaggers, utility work, TDS, Dane Tenold, 541-904-5501

CURRENT ROAD CLOSURES

• Redmond Wetlands Complex Project – www.redmondwetlandscomplex.com - Julie Thiessen, Project Engineer, Julie.thiessen@redmondoregon.gov, 541-504-2016

  • Northwest Way north of NW Coyner Ave, intermittent single lane closure with flaggers directing both directions, full access maintained to all cross-streets
  • Project Site at 5801 Northwest Way, public access is closed in this area until the completion of the project in late 2027.

• Northwest Way north of NW Coyner Ave, intermittent single lane closure with flaggers directing both directions, full access maintained to all cross-streets

• Project Site at 5801 Northwest Way, public access is closed in this area until the completion of the project in late 2027.

• Eastside Arterial Project – www.redmondoregon.gov/eastsidearterial - Jake Sherman, Principal Engineer, jake.sherman@redmondoregon.gov, 541-504-2019

  • NE 9th St between E Antler Ave & OR 126, 7/20 – 10/16, full closure, detour onto HWY 97

• NE 9th St between E Antler Ave & OR 126, 7/20 – 10/16, full closure, detour onto HWY 97

• 4th Street Water Main Replacement Project – Veronica Reinertson, Project Engineer, veronica.reinertson@redmondoregon.gov, 541-504-2026

  • NW 4th Street between NW Elm Avenue and NW Hemlock Court, 7/13 – 10/19, Full closure with access for local traffic
  • NW Fir Avenue between NW 4th Street and NW 5th Street, 8/21 – 10/19, full closure with access for local traffic

• NW 4th Street between NW Elm Avenue and NW Hemlock Court, 7/13 – 10/19, Full closure with access for local traffic

• NW Fir Avenue between NW 4th Street and NW 5th Street, 8/21 – 10/19, full closure with access for local traffic

• SW Odem Medo Rd at SW Canal Blvd., 10/14, 8am start, shut off traffic signal with flaggers present, Lightspeed Networks, Brent Smith, 541-974-3797

• NW Greenwood Ave., NW 32nd St. to NW 31st St., 10/5 – 11/5, 7am start, Road closure (local access only), reconstruction of road, HPP Excavation LLC, Josh Smith, 541-306-9359

TRAFFIC IMPACTS (single lane closures, roadside work, traffic control changes, etc.)

• Cascade Natural Gas 6” pipeline installation, 7/30 – 10/16, day shift 7am – 5:30pm, night shift 8pm – 6am (US 126), Hanging H Companies LLC, Rodney Kilgore, rkilgore@hanginghco.com, 903-824-7959

• SW 23rd ST from SW Glacier Pl to SW Rimrock Way, 10/12 – 10/16, one-lane shift for striping

• SW Canal Blvd., SW Odem Medo Rd to SW Reindeer Ave., 10/14 – 10/16, 8am start, one-lane shift with flaggers, Lightspeed Networks, Brent Smith, 541-974-3797

• SW Airport Way, SW Mt. Hood Dr. to SE Salmon Dr., 10/14 – 10/15, one-lane shift, asphalt repair, Transportation Division, City of Redmond, Preston Romanick, 541-280-8146

• West Antler Ave., NW 29th to NW 19th St.,10/12, 8am start, north lane shoulder work and flaggers present, Grid Point Solutions, David Thompson, 503-218-7006

• SW 27th St., Glacier Ave to W Antler Ave., 10/12, 8am start, westbound lane shoulder work and flaggers present, Grid Point Solutions, David Thompson, 503-218-7006

• SW Juniper Ave between SW 31st St. & SW 33rd St., 9/28-10/12, 8am start, westbound lane shoulder work and flaggers present, Grid Point Solutions, David Thompson, 503-218-7006

• NW 19th St & NW Maple Ave Traffic Signal Project – www.redmondoregon.gov/maple-signal - Julie Thiessen, Project Engineer, julie.thiessen@redmondoregon.gov 541-504-2016

  • Intermittent turn lane closures and lane shifts

• SW 1st Street, SW Pumice Ave. to SE College Loop, 9/14 – 10/23, 7:30am start, lane shift, utility work, Stilson Builders, Ryan Bartlett, 503-419-8719

UPCOMING TRAFFIC IMPACTS & ROAD CLOSURES

• Eastside Arterial Project – www.redmondoregon.gov/eastsidearterial - Jake Sherman, Principal Engineer, jake.sherman@redmondoregon.gov, 541-504-2019

  • NE 9th Street between E Antler Ave & NE Hemlock Avenue, Starting 10/19/26 – 1/31/27, full closure, detour onto NE 11th Street

• NE 9th Street between E Antler Ave & NE Hemlock Avenue, Starting 10/19/26 – 1/31/27, full closure, detour onto NE 11th Street